KEEPING INNOVATION ALIVE - TOUCHWOOD             The following photo's depict the actual time frame for erecting prefabricated              walls for a typical 90m2 Touchwood home.

     

8:00am - Touchwood walls arrive on site      9:00am - Crane arrives and the first 2 walls and are placed near floor for easy access.     are located and fixed into possition.

      

10:00am - Walls continue to fall into place    11:00am - The last of the walls are dropped              and people are flocking to see what all the     into place.                                                                the fuss is about.

     

12:00Noon - All Touchwood walls are up and the crane driver has departed. A number                 of people have stayed to watch our progress and learn about the new system.

Finished Product